In the summer of 2025, a high-performance photovoltaic system with a total capacity of 328 kWp was installed at a commercial enterprise in Glottertal by Meike Elektrotechnik. The project highlights how industrial businesses can integrate clean energy to reduce costs and environmental impact.
The system comprises 728 Trinasolar Vertex S+ modules and is expected to generate around 330,000 kWh per year, supplying the company with sustainable electricity and contributing significantly to lowering CO? emissions.
Thanks to an optimally oriented roof, modern inverter technology, and careful project planning, the installation achieves a particularly high rate of self-consumption. This project demonstrates how Trinasolar technology can provide reliable, high-performance solutions for commercial operations seeking long-term energy savings and sustainability.